上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
5 Equipment Installation
5.1 General Requirements
5.1.1 This chapter shall be applicable to the quality acceptance of installation of hydraulic,lubrication and pneumatic equipment,not including the air supply equipment and the pneumatic equipment with working pressure of more than 1.0MPa.
5.1.2 The control valve shall be installed at the position convenient for operation and maintenance.