![DL/T5210.4-2009电力建设施工质量验收及评价规程第4部分:热工仪表及控制装置(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/49/33689049/b_33689049.jpg)
4.5 Installation of Local Inspection and Control Instrument
4.5.1 Quantity for acceptance inspection.
1 Important instruments and equipments with high temperature,high pressure,negative pressure,water level,attacking media,flow and being combustible,explosive and toxic shall be inspected 100%.
2 Those instruments with general parameters shall be randomly inspected 30% according to the systems and functions respectively.
4.5.2 Installation of pressure/differential-pressure indicating instrument and transmitter.
1 Installation inspection and acceptance of local indicating pressure gauge are detailed in Table 4.5.2-1.
Table 4.5.2-1 Installation of local indicating pressure gauge
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_157.jpg?sign=1738985201-yQAN39oYvHQtMrn7kEa59ibp0Alz22p3-0-b20a62caf99a5b96a4d5ed3aee43aacd)
2 Inspection and acceptance of indicating pressure gauge with signal contact are detailed in Table 4.5.2-2.
Table 4.5.2-2 Installation of indicating pressure gauge with signal contact
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_158.jpg?sign=1738985201-NmBgwbL28t3F2NF2LhKGB0NsgEbqKFIk-0-249893821769ba4b3440000f13459c57)
3 Installation inspection and acceptance of local differential-pressure indicating instrument are detailed in Table 4.5.2-3.
Table 4.5.2-3 Installation of local differential-pressure indicating instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_159.jpg?sign=1738985201-Dqmt3LY3NZWRxXFzuMvAYrBDc9La7ij6-0-45c5900d0075c92cd515a5a3f9ef21eb)
4 Installation inspection and acceptance of differential-pressure indicating instrument with signal contact are detailed in Table 4.5.2-4.
Table 4.5.2-4 Installation of differential-pressure indicating instrument with signal contact
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_160.jpg?sign=1738985201-vkL6BqxKvHzeiePSGAHmFiTAo89TWIae-0-c9900f1f3ff8ea6428a4b747643dd0ae)
Table 4.5.2-4(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_161.jpg?sign=1738985201-lLeGSca3RrBoB848EwCErUpDbCb6f4f1-0-2f5ca96a55cf70d552fb8655b636d390)
5 Installation inspection and acceptance of transmitter are detailed in Table 4.5.2-5.
Table 4.5.2-5 Installation of transmitter
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_162.jpg?sign=1738985201-8uOxvdHEMrrKVvXiNL10O2VU2aNqhAoG-0-8029bba21ab6a7e9f7357f346e7107cb)
4.5.3 Switching value instrument.
1 Installation inspection and acceptance of temperature switch are Table 4.5.3-1.
Table 4.5.3-1 Installation of temperature switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_163.jpg?sign=1738985201-FMdByApWrrXRlTo3TUNV7EgBEkmbkIcn-0-070c883f5c7a0bebad64a56e24bfd029)
2 Installation inspection and acceptance of pressure and differential pressure switches are detailed in Table 4.5.3-2.
Table 4.5.3-2 Installation of pressure and differential pressure switches
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_164.jpg?sign=1738985201-ijlA7mpOneU7lpeVY0UIvItKxdmKtkKW-0-0cdfd606c661ce5ce309ffbc4fa3a954)
3 Installation inspection and acceptance of flow switch are detailed in Table 4.5.3-3.
Table 4.5.3-3 Installation of flow switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_165.jpg?sign=1738985201-TSV7fCLCkSVkSYQwNkLuHHDC8wXOXeX0-0-ec6def8ccd115531cf01564c9a4ebbe6)
4 Installation inspection and acceptance of level switch are detailed in Table 4.5.3-4.
Table 4.5.3-4 Installation of level switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_166.jpg?sign=1738985201-olVSU8qMALMcp5ddjxjKnaBJwut7OGxy-0-1965cc16723e9a8c00f52e9b068876a0)
5 Installation inspection and acceptance of travel switch are detailed in Table 4.5.3-5.
Table 4.5.3-5 Installation of travel switch
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_167.jpg?sign=1738985201-Xw3tvdo3VOutPedZVaS1XZ3K2Tl62kBc-0-803d0dbf0512c3cf7046a94e2c9e6e59)
4.5.4 Analysis instrument.
1 Installation inspection and acceptance of gas composition analysis instrument are detailed in Table 4.5.4-1.
Table 4.5.4-1 Installation of gas composition analysis instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_168.jpg?sign=1738985201-WvXjqpOWq3CRDNKJhYlHhS0GcgnUvdrL-0-f7dbdde10c0ba486694a22f0ea5b93aa)
2 Installation inspection and acceptance of steam-water analysis instrument are detailed in Table 4.5.4-2.
Table 4.5.4-2 Installation of steam-water analysis instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_169.jpg?sign=1738985201-WQMTX7kvIqZ0i3voX8mZdNm7aQsLdLio-0-218d883e9b50f81af7c7a0f9814aff9c)
3 Installation inspection and acceptance of steam-water analysis station are detailed in Table 4.5.4-3.
Table 4.5.4-3 Installation of steam-water analysis station
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_170.jpg?sign=1738985201-JlAxCSzvFwlpRbQtsekOeZxRWL0WyOCw-0-c78ad5e9f0880ce8118c744d92bb1425)
4.5.5 Actuator.
1 Installation inspection and acceptance of motor-driven actuator are detailed in Table 4.5.5-1.
Table 4.5.5-1 Installation of motor-driven actuator
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_171.jpg?sign=1738985201-tLeYF7lURSt4m67uJ9Npa5KlyFMK2msm-0-e87beb29d1bf1a95fbb366fd3a0bb84a)
2 Installation inspection and acceptance of pneumatic actuator are detailed in Table 4.5.5-2.
Table 4.5.5-2 Installation of pneumatic actuator
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_172.jpg?sign=1738985201-4UBiliMtG1Yw8S1G0GyAPOhs6zDYsUE7-0-c8f230a73370393a52ed8a6d8fa0f8d9)
3 Installation inspection and acceptance of motor-driven valve's motor are detailed in Table 4.5.5-3.
Table 4.5.5-3 Installation of motor-driven valve's motor
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_173.jpg?sign=1738985201-deQnNRB6izVDaVhrVvUcIsb6DRw72HBQ-0-bd40967c4bd5fb0ab9f151fe435eb753)
4 Installation inspection and acceptance of driving arm are detailed in Table 4.5.5-4.
Table 4.5.5-4 Installation of driving arm
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_174.jpg?sign=1738985201-KeSly6AveGdeN5y0Sswu12zzHMVuOOb6-0-44c0568757413b710d4eae00044b9641)
5 Installation inspection and acceptance of solenoid valve are detailed in Table 4.5.5-5.
Table 4.5.5-5 Installation of solenoid valve
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_175.jpg?sign=1738985201-G0L015qnSyoMimdDO2szSUmzShrz7dnu-0-ba2bd057550f80d9d9d02b9cdcb8aade)
6 Installation inspection and acceptance of the control system for vibration coal feeder are detailed in Table 4.5.5-6.
Table 4.5.5-6 Installation of the control system for vibration coal feeder
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_176.jpg?sign=1738985201-tBQ6AqHHnRVA8ULNBoMXoXGgoIOzDQsh-0-0bb30b7b20dc0e44bf924004854bbeb5)
7 Installation inspection and acceptance of the control system for pneumatic control valve are detailed in Table 4.5.5-7.
Table 4.5.5-7 Installation of the control system for pneumatic control valve
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_177.jpg?sign=1738985201-i8LnpzaNOtdu28RQewfDI0R9QqUp5Uw1-0-8501cbc97a8b8c9d08923dbf5cb6616f)
4.5.6 Pneumatic local-mounted instrument.
1 Installation inspection and acceptance of pneumatic local-mounted instrument are detailed in Table 4.5.6-1.
Table 4.5.6-1 Installation of pneumatic local-mounted instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_178.jpg?sign=1738985201-3CxDl51hBAiIw0fSeZ1DPisvZcYsv3hS-0-94d867f1811a559a62766848398e48ea)
2 Installation inspection and acceptance of PLC are detailed in Table 4.5.6-2.
Table 4.5.6-2 Installation of PLC
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_179.jpg?sign=1738985201-lBIbzvCspXjVybiANnKLB5uUE7WWxKVz-0-a6f21af120d1df8d6cd2f3c05100e43b)